Friday, 26 August 2016

INSTRUCTION LETTER FOR SHIPMENT PAPER FILLING

INSTRUCTION LETTER FOR SHIPMENT PAPER FILLING  


Our Ref.No.

CONTACT PERSON: ……………                                                                                                                       
Company name and address

SUB:    Incoterm  Shipment to consignee name and country name


Dear Sir/Madam,

A.      We are enclosing herewith following Invoices along with its respective Packing Lists and draft Bills of Lading. The cargo will be factory stuffing/clubbing at port.
1.       The Stuffing will be ___________________

2.       Or Clubbing will be at PORT NAME.

CUSTOM Invoice No.
RQUIRMENT OF No./Type of Container
ARE-1 Value/ARE 1 Not Applicable.
H.S. Code MEANS GOODS CODE IN CATEGORY
PAPER FILL IN WHICH DBK Sr. No.
IF ANY COMMENT AND UPDATE REMARKS





 





 

B.          Please take care of the following points:-
1. Break up of FOB Value:
a.           Overseas agent’s commission IF ANY of AS PER TERMS Value.

b.           Insurance – IF ANY AS PER INCOTERMS

c.           Sea Freight from Indian Port to _____________ at actual.  
d.          DISCOUNT IF ANY.    
2.             Please collect ‘Original’ and ‘Duplicate’ copies of ARE-1 at the time of stuffing of the cargo without fail for endorsement by Customs Department, towards proof of export.
3.             Wherever DBK is to be claimed the same should be claimed at lower rate applicable under the Heading ‘Cenvat availed’.     
4.             Dispatch of the goods / container from factory to the port should be covered under a proper Truck Receipt/Consignment Note to take care of Excise/Taxation requirement.  The Truck Receipt/Consignment Note must also mention the trailer number as well as container number.
5.             Be Ensure that FOB Value should not appear in negative amount.
6.             Following Declaration must appear in each and every Shipping Bill: “We hereby declare that we intend to claim rewards under Merchandise Exports from India Scheme (MEIS).
7.          MEIS HS Code and Description should be mentioned in Shipping Bills along with DBK S No. and its description.
8.            In addition, it is mandatory to put a remark in “Reward Item box” with a tick mark “Y” while feeding of data in the EDI shipping bills.  Only with this remark, the shipping bills get automatically transmitted to DGFT site for availing benefit of above scheme.  If this remark is not given, the shipping bills will not be transmitted to DGFT.
9.             For drawback, the text should appear on shipping bill “THESE GOODS FORM PART OF PROJECT EXPORTS.  WE HEREBY DECLARE THAT WE DO NOT HAVE ANY OBJECTION TO DRAWBACK BENEFIT BEING RESTRICTED BASED ON 150% OF ARE1 VALUE OR FOB VALUE WHICHEVER IS LOWER”. Please ensure ARE-1 Number and Date must appear in each and every shipping bill. Also ARE-1 value must be recorded in the “Departmental Comments’ field by Customs WITHOUT FAIL.
                Please take note that Invoice value should always be little higher than ARE 1 Value.
10.          Road permit form 38 is Mandatory when goods are brought to ICD Dadri (Uttar Pradesh) for export. Paper should be filed at ICD Dadri.
11.          Kindly always check billing factor between Invoice value and ARE 1 Value and if factor is higher than 400 times, you ask for specific approval.  Before filling documents in the Customs with higher factor, kindly ensure that customs clearance will be done without any problem.
12.          Kindly ensure that ARE 1 is duly endorsed by the Customs and has our shipping bill and pre shipment Invoice Number.
13.          Kindly ensure that you do not accept any pre shipment document from Project Team and has to routed through Commercial Team only. Kindly do not accept any verbal changes and has to via E mail through Commercial Team.
14.          Please ensure that Shipping Bill should contain AD Code                               Bank.
15.          If ARE 1 is not applicable, kindly take prior approval from Mr. RC sharma before accepting and filing documents in Customs.  Once you have approval to proceed, kindly ensure that you have valid reason for non having ARE 1 and proper declaration is giving to Customs accordingly.
16.          Please provide us all post shipping documents within 2/3 days from SOB Date along with any specific documents requested to meet LC requirement.
17           Always to use Blue Dart courier for couriering the documents within Domestic and DHL in case documents are being dispatched from outside India.
18.          Kindly ensure that containers are stuffed to their full capacity.
19.          Kindly see that ARE 1 for has reference of CT1 Number before accepting ARE 1.
20.          Please ensure compliance of above instructions and in case of any deviation you must inform us immediately for our prior written approval for the deviations.
21.          Based on our written consent, if a shipping bill is assessed provisionally, it is obligatory on the part of clearing agent to get it assessed finally.
22.          Where invoice indicates erection/commissioning charges also, FOB value of goods and “erection/commissioning charges” should be shown separately.  Description of  “erection/commissioning charges” should be shown as ERECTION/COMMISSIONING CHARGES (ENGINEERING SERVICES  -MEIS and DBK NOT CLAIMED).   Reward box should be marked “Yes”.  Shipping bill,  only to the extent of value of “erection/commissioning charges (Engineering Services)” should be Free Shipping Bill.
23.         Please add SDF declaration on shipping bill “I/We undertake to abide by provisions of FEMA 1999 amended from time to time incd realization/repatriation foreign exchange to or from India”
24.          “Please note that weight mentioned in our Invoice and Packing List may differ from ARE 1/Actual Weight.   Please ensure that Weight matches with Shipping Bill/ARE 1 and Packing List according to VGM System before generation of shipping bill. Please generate Shipping Bill once weight is correct in all documents. “
                                                                                        
Thanks & Regards

Encl:    Pre Shipment Invoice
             Pre Shipment Packing List

             Draft BL

No comments: